• INDUSTRY & AGRICULTURE

    Efficient construction with
    monumental strength
    and great flexibility


Long live sound buildings

The frame structure plays a key role in any construction project. Strong portal frames are thus essential in order to create and maintain a sound building. A building with a long lifetime.

Frame structures can be designed in several different ways. With more than 20 years’ experience in steel construction for several sectors, including industry and agriculture, CSK is always ready to advise on the best choice – even for architecturally demanding construction projects.

The optimum design is primarily determined by factors such as the application, span, design, façade height, insulation and budget.

For modern industrial buildings, we often recommend using a welded frame structure. This solution is ideal for buildings with a span of 20 to 50 metres, as these offer good conditions for optimising material and wage costs, as well as the steel structure itself.

Reasons to choose CSK

Ten good reasons to choose CSK as a supplier of steel structures for your data centre

Safety

01

Safety

Occupational health and safety have top priority at CSK. This is borne out in a number of exceptional safety initiatives, and a certification under ISO 45001:2018.

Flexibility

02

Flexibility

Flexibility is a constant parameter throughout the value chain at CSK – from the type of contract, to design, production, logistics, delivery time and installation.

Team

03

Team

CSK ensures that the expectations of the developer and management contractor are totally reconciled, and puts together the perfect team for each project on that basis.

End-to-end

04

End-to-end

CSK offers design, planning, production and surface treatment for primary and secondary steel structures, in addition to the associated metalwork and assembly.

Production control

05

Production control

Our FPC (Factory Production Control) is certified under EN 1090-1 EXC 4. This means that we can CE mark steel structures in the highest consequence class (CC3) under the European Construction Products Regulation.

Quality management

06

Quality management

The quality management system at CSK’s factories in Denmark is based on ISO 9001. Our factory in Latvia is certified under ISO 9001:2015.

Sustainability

07

Sustainability

CSK works actively with environmental, social and economic sustainability. We operate within the leading international sustainability standards (DGNB, BREEAM, LEED and HQE) and are also environmentally certified under ISO 14001:2015.

Logistics

08

Logistics

Efficient and flexible logistics are a key element of CSK’s success. Our logistics department has both the experience and determination to meet any customer request.

Contract

09

Contract

CSK has extensive experience in the contractual and legal aspects of a wide range of construction and building projects. Our experience covers everything from data centres and industrial structures to building components such as staircases, balconies and steel roof trusses. We have experience with NDAs and other contractual matters. We are also open to exploring different forms of collaboration.

Financial stability

10

Financial stability

When you choose CSK, you are choosing a steel supplier with the financial stability necessary to take your construction project safely to the end. As an added security for you, we have the highest Bisnode credit rating (AAA).

We have been building strong
buildings for agriculture
and industry since 1997.

Process
We help you to fully achieve your goals
  • Quotations with personal service

    Quotations with personal service

    All enquiries to CSK are dealt with in person by our professional sales department. To ensure a proper quotation, the materials and information received from the customer are carefully studied.

    Once a prospective customer has contacted the company and explained their requirements, we submit a non-binding quotation based on the specifications, the written material and the personal contact.

    The quotation will thus form the basis for future design and project clarification.

  • Specialist knowledge and collaboration

    Specialist knowledge and collaboration

    An important factor for any project – large or small – is that it must be the best solution for the customer while giving us the optimum opportunity to supply the best result. Therefore, it is to everyone’s benefit that we participate as early as possible in the projects, and contribute constructive options and solutions during the design process. Here we consider every conceivable and inconceivable challenge at every stage of the project. It is also here that the creative and innovative ideas are reviewed and assessed. We often use specialist consultants to solve special challenges. The design work takes place in close collaboration with the client, lead or main contractor as well as their consultants. Our design departments are staffed by experienced and creative engineers and developers who are always striving to find the optimum solution on behalf of our customers.

  • Highly qualified employees and advanced equipment

    Highly qualified employees and advanced equipment

    CSK is geared for the future in everything it does. Our drawing departments are manned by experienced and well-trained engineers and technical 3D drafters who master the latest 3D design tools. Consequently, we can quickly and efficiently produce drawings for any project. The main task of the drawing department is to transform the project presentation and design results into concrete working drawings which can be used to visualise the project. These drawings will also be used in production and later during installation.

    We use both Tekla and AutoCAD software. Our drawing tools also give the customer the opportunity to see the design in 3D. As a result, the customer is able to obtain a good impression of the finished steel solution at a very early stage. This in turn gives the customer the opportunity to correct and adjust any inexpediencies. Our skilled employees and 3D design tools ensure the highest degree of flexibility.

  • Stringent quality requirements and efficient logistics

    Stringent quality requirements and efficient logistics

    In production we operate with advanced CNC-controlled equipment, which is always being updated to the best and most efficient versions. Our rigorous quality assurance means that nothing is left to chance, and that we continuously run checks according to the highest standards. Our skilled and quality-conscious employees ensure that the quality of our steel structures is second to none.

    Logistics
    We also have a highly efficient logistics function which ensures that raw materials, quality requirements and efficient logistics ??? finished goods, construction site supplies etc. arrive at and leave the factory and construction sites in the most expedient way.
    Consequently, we can offer very precise planning, which ultimately leads to significant savings.
    The CSK factories in Thisted and Tukums have a wide range of modern and efficient machinery at their disposal, with everything from hand-held welding equipment and shot blasting and welding machines to CNC-controlled plasma cutters and CNC-controlled drilling/sawing machines.

    Final finish
    The last stage of the production process involves surface-treating the steel structures. This happens in our own paint shops according to customer specifications. Once the surface is dry, and the structure is ready for installation, it is loaded onto our trailers and driven to the construction site where our installation crew is ready.

  • We are experts – on land and sea and from the air

    We are experts – on land and sea and from the air

    Installation work requires considerable expertise, because often the crews are faced with tasks where no standard solutions exist. The actual installation work is the final stage of the process for any assignment undertaken by CSK. However, extensive planning and coordination work precedes the installation phase. This is because installing the individual elements requires that the right parts are on site at the right time – including cranes and trucks.

    The installation crew are experts who understand advanced welds and who are used to working in difficult conditions. Basically, installing steel structures requires well-trained and creative professionals. At CSK, safety is a key priority, and therefore all our installers complete a safety course. Our installers are equipped with everything they need to tackle the task in hand, and they are all very quality-conscious and capable of working independently. Finally, we do not leave the site before the task is finished – on time of course!

  • Overall evaluation and quality assurance

    Overall evaluation and quality assurance

    In addition to ongoing evaluation during the project phase, each project is concluded with an overall evaluation. Here, the project’s individual phases are reviewed from design to production and installation.

    Our evaluation of course also involves the customer’s experience and assessment. The evaluation is used to ensure that CSK meets both its customers’ and its own expectations at all times.

Need assistance
with a similar project?

Kenneth P. Nielsen
Sales representative
Lars Søndergaard
Sales representative